Note more than ……. bags should be kept one above other.
A.
20
B.
25
C.
14
D.
Any of above
Answer» C. 14
2.2k
0
Do you find this helpful?
1
View all MCQs in
Concrete Technology
Discussion
No comments yet
Login to comment
Related MCQs
The prevent the cement bags from any possible contact with moisture, the main point that should be kept in mind is that the
If the effective plan area of a warehouse is 54 m2, and the maximum height of pile permitted is 2.7 m, then the number of cement bags to be stord is
The number of bags of cement required per cubic metre of 1 ; 2 ; 4 concrete will be approximately
The process of mixing, transporting, placing and compacting concrete should not take more than ……. min any case.
The process of mixing, transporting, placing and compacting the cement concrete should not take more than
To prevent segregation, the concrete should not be thrown from a height of more than
An aggregate is known as cyclopean aggregate if its size is more than
Low heat cement contains more lime than ordinary Portland cement.
More water should not be added in the concrete mix, as to increase
For concrete exposed to a very aggressive environment the w/c should be lower than __________