

McqMate
Q. |
When the batching of material is done by weight |
A. | the bucket in which the material is to be weighed should be cleaned thoroughly |
B. | the weighing machine should be levelled before placing the material |
C. | the chart should be prepared indicating the weight of each material used for different strengths of concrete |
D. | all of the above |
Answer» D. all of the above |
View all MCQs in
Concrete TechnologyNo comments yet