McqMate
| Q. |
A spoil bank is formed when the |
| A. | canal has steel bed slope |
| B. | canal section is too large |
| C. | volume of excavation is in excess of the embankment filling |
| D. | canal alignment is meandrous |
| Answer» C. volume of excavation is in excess of the embankment filling | |
View all MCQs in
Irrigation EngineeringNo comments yet