Q. |
When …………………….is used on the basis of budgeted overheads and the rate is applied to the actual base, the actual overhead expenses may be different from the charged overheads. |
A. | a predetermined rate |
B. | actual rate method of absorption |
C. | both a & b |
D. | none of these |
Answer» A. a predetermined rate |