Chapter: Testing for Specialized Environment
1.

This type of test include, how well the user will be able to understand and interact with the system?

A. usability testing
B. user acceptance testing
C. alpha testing
D. beta testing.
Answer» A. usability testing
2.

Defects generally fall into the following categories?

A. wrong
B. missing
C. extra
D. all the above
Answer» D. all the above
3.

What is correct Software Process Cycle?

A. plan(p)——>check(c)——>act(a)—–>do(d)
B. plan(p)——>do(d)——>check(c)—–>act(a)
C. plan(p)——>do(d)——>act(a)—–>check(c)
Answer» B. plan(p)——>do(d)——>check(c)—–>act(a)
4.

Maintenance Plan predicts the maintenance requirements of the system, maintenance costs and effort required

A. true
B. false
Answer» A. true
5.

Beta testing will be done by

A. developer
B. user
C. tester
Answer» B. user
6.

Validation plan describes the approach ,resources and schedule used for system validation

A. true
B. false
Answer» A. true
7.

Integration, It will come under

A. cmm level 1
B. cmm level 3
C. cmm level 2
D. none
Answer» B. cmm level 3
8.

Types of quality tools are Problem Identification Tools and Problem Analysis Tools.

A. true
B. false
Answer» A. true
9.

Which Software Development Life cycle model will require to start Testing Activities when starting development activities itself

A. water falls model
B. spiral model
C. v-model
D. linear model
Answer» C. v-model
10.

A metric used to measure the characteristic of the methods, Techniques and tools employed in developing, implementing and maintaining the software system called as

A. process metric
B. product metric
C. test metrics
Answer» A. process metric
11.

Check Sheet(Checklist. is considered a simple , but powerful statistical tool because it differentiates between two extremes.

A. true
B. false
Answer» A. true
12.

Application should be stable. Clear Design and Flow of the application is needed for Automation testing.

A. false
B. true
Answer» B. true
13.

Quality plan describes the quality procedures and standards that will be used in a project.

A. false
B. true
Answer» B. true
14.

How severely the bug is effecting the application is called as

A. severity
B. priority
C. fix ability
D. traceability
Answer» A. severity
15.

Project Risk affects The Schedule or Resources.

A. true
B. false
Answer» A. true
16.

The name of the testing which is done to make sure the existing features are not affected by new changes

A. recursive testing
B. whitebox testing
C. unit testing
D. regression testing
Answer» D. regression testing
17.

Management and Measurement, It will come under

A. cmm level 1
B. cmm level 3
C. cmm level 4
D. cmm level 2
Answer» C. cmm level 4
18.

AdHoc testing is a part of

A. unit testing
B. regression tesing
C. exploratory testing
D. performance testing
Answer» C. exploratory testing
19.

Cost of Production = Right The First time cost(RTF. + Cost of Quality.

A. true
B. false
Answer» A. true
20.

————- means under what test environment(Hardware, software set up. the application will run smoothly

A. test bed
B. checkpoint
C. code walk through
D. checklist
Answer» A. test bed
21.

TQM represents

A. tool quality management
B. test quality manager
C. total quality management
D. total quality manager
Answer» C. total quality management
22.

Optimization, Defect Prevention, and Quality Control. Its come under the

A. cmm level 2
B. cmm level 3
C. cmm level 4
D. cmm level5
Answer» D. cmm level5
23.

Unit Testing will be done by

A. testers
B. end users
C. customer
D. developers
Answer» D. developers
24.

Beta testing will be done at

A. user place
B. developers place
Answer» A. user place
25.

A Plan to overcome the risk called as

A. migration plan
B. master plan
C. maintenance plan
D. mitigation plan
Answer» D. mitigation plan
26.

Which of the following is not one of the techniques to find defects

A. operational techniques
B. functional techniques
C. dynamic techniques
D. static techniques
Answer» A. operational techniques
27.

Quality Assurance methods are usually considered

A. detective
B. corrective
C. preventive
D. proactive
Answer» C. preventive
28.

Who has the primary responsibility of setting the quality culture in the organization?

A. senior management
B. the training department
C. the quality department
D. nobody
Answer» C. the quality department
29.

Verification is

A. checking that we are building the right system
B. checking that we are building the system right
C. performed by an independent test team
D. making sure that it is what the user really wants
Answer» B. checking that we are building the system right
30.

A regression test

A. will always be automated
B. will help ensure unchanged areas of the software have not been affected
C. will help ensure changed areas of the software have not been affected
D. can only be run during user acceptance testing
Answer» B. will help ensure unchanged areas of the software have not been affected
31.

If an expected result is not specified then:

A. we cannot run the test
B. it may be difficult to repeat the test
C. it may be difficult to determine if the test has passed or failed
D. we cannot automate the user inputs
Answer» C. it may be difficult to determine if the test has passed or failed
32.

Which of the following is not a static testing technique

A. error guessing
B. walkthrough
C. data flow analysis
D. inspections
Answer» A. error guessing
33.

Which of the following statements about component testing is not true?

A. component testing should be performed by development
B. component testing is also known as isolation or module testing
C. component testing should have completion criteria planned
D. component testing does not involve regression testing
Answer» D. component testing does not involve regression testing
34.

During which test activity could faults be found most cost effectively?

A. execution
B. design
C. planning
D. check exit criteria completion
Answer» C. planning
35.

The purpose of requirement phase is

A. to freeze requirements
B. to understand user needs
C. to define the scope of testing
D. all of the above
Answer» D. all of the above
36.

Which, in general, is the least required skill of a good tester?

A. being diplomatic
B. able to write software
C. having good attention to detail
D. able to be relied on
Answer» B. able to write software
37.

The process starting with the terminal modules is called

A. top-down integration
B. bottom-up integration
C. none of the above
D. module integration
Answer» B. bottom-up integration
38.

The inputs for developing a test plan are taken from

A. project plan
B. business plan
C. support plan
D. none of the above
Answer» A. project plan
39.

Function/Test matrix is a type of

A. interim test report
B. final test report
C. project status report
D. management report
Answer» C. project status report
Tags
Question and answers in Testing for Specialized Environment, Testing for Specialized Environment multiple choice questions and answers, Testing for Specialized Environment Important MCQs, Solved MCQs for Testing for Specialized Environment, Testing for Specialized Environment MCQs with answers PDF download