1. |
This type of test include, how well the user will be able to understand and interact with the system? |
A. | usability testing |
B. | user acceptance testing |
C. | alpha testing |
D. | beta testing. |
Answer» A. usability testing |
2. |
Defects generally fall into the following categories? |
A. | wrong |
B. | missing |
C. | extra |
D. | all the above |
Answer» D. all the above |
3. |
What is correct Software Process Cycle? |
A. | plan(p)——>check(c)——>act(a)—–>do(d) |
B. | plan(p)——>do(d)——>check(c)—–>act(a) |
C. | plan(p)——>do(d)——>act(a)—–>check(c) |
Answer» B. plan(p)——>do(d)——>check(c)—–>act(a) |
4. |
Maintenance Plan predicts the maintenance requirements of the system, maintenance costs and effort required |
A. | true |
B. | false |
Answer» A. true |
5. |
Beta testing will be done by |
A. | developer |
B. | user |
C. | tester |
Answer» B. user |
6. |
Validation plan describes the approach ,resources and schedule used for system validation |
A. | true |
B. | false |
Answer» A. true |
7. |
Integration, It will come under |
A. | cmm level 1 |
B. | cmm level 3 |
C. | cmm level 2 |
D. | none |
Answer» B. cmm level 3 |
8. |
Types of quality tools are Problem Identification Tools and Problem Analysis Tools. |
A. | true |
B. | false |
Answer» A. true |
9. |
Which Software Development Life cycle model will require to start Testing Activities when starting development activities itself |
A. | water falls model |
B. | spiral model |
C. | v-model |
D. | linear model |
Answer» C. v-model |
10. |
A metric used to measure the characteristic of the methods, Techniques and tools employed in developing, implementing and maintaining the software system called as |
A. | process metric |
B. | product metric |
C. | test metrics |
Answer» A. process metric |
11. |
Check Sheet(Checklist. is considered a simple , but powerful statistical tool because it differentiates between two extremes. |
A. | true |
B. | false |
Answer» A. true |
12. |
Application should be stable. Clear Design and Flow of the application is needed for Automation testing. |
A. | false |
B. | true |
Answer» B. true |
13. |
Quality plan describes the quality procedures and standards that will be used in a project. |
A. | false |
B. | true |
Answer» B. true |
14. |
How severely the bug is effecting the application is called as |
A. | severity |
B. | priority |
C. | fix ability |
D. | traceability |
Answer» A. severity |
15. |
Project Risk affects The Schedule or Resources. |
A. | true |
B. | false |
Answer» A. true |
16. |
The name of the testing which is done to make sure the existing features are not affected by new changes |
A. | recursive testing |
B. | whitebox testing |
C. | unit testing |
D. | regression testing |
Answer» D. regression testing |
17. |
Management and Measurement, It will come under |
A. | cmm level 1 |
B. | cmm level 3 |
C. | cmm level 4 |
D. | cmm level 2 |
Answer» C. cmm level 4 |
18. |
AdHoc testing is a part of |
A. | unit testing |
B. | regression tesing |
C. | exploratory testing |
D. | performance testing |
Answer» C. exploratory testing |
19. |
Cost of Production = Right The First time cost(RTF. + Cost of Quality. |
A. | true |
B. | false |
Answer» A. true |
20. |
————- means under what test environment(Hardware, software set up. the application will run smoothly |
A. | test bed |
B. | checkpoint |
C. | code walk through |
D. | checklist |
Answer» A. test bed |
21. |
TQM represents |
A. | tool quality management |
B. | test quality manager |
C. | total quality management |
D. | total quality manager |
Answer» C. total quality management |
22. |
Optimization, Defect Prevention, and Quality Control. Its come under the |
A. | cmm level 2 |
B. | cmm level 3 |
C. | cmm level 4 |
D. | cmm level5 |
Answer» D. cmm level5 |
23. |
Unit Testing will be done by |
A. | testers |
B. | end users |
C. | customer |
D. | developers |
Answer» D. developers |
24. |
Beta testing will be done at |
A. | user place |
B. | developers place |
Answer» A. user place |
25. |
A Plan to overcome the risk called as |
A. | migration plan |
B. | master plan |
C. | maintenance plan |
D. | mitigation plan |
Answer» D. mitigation plan |
26. |
Which of the following is not one of the techniques to find defects |
A. | operational techniques |
B. | functional techniques |
C. | dynamic techniques |
D. | static techniques |
Answer» A. operational techniques |
27. |
Quality Assurance methods are usually considered |
A. | detective |
B. | corrective |
C. | preventive |
D. | proactive |
Answer» C. preventive |
28. |
Who has the primary responsibility of setting the quality culture in the organization? |
A. | senior management |
B. | the training department |
C. | the quality department |
D. | nobody |
Answer» C. the quality department |
29. |
Verification is |
A. | checking that we are building the right system |
B. | checking that we are building the system right |
C. | performed by an independent test team |
D. | making sure that it is what the user really wants |
Answer» B. checking that we are building the system right |
30. |
A regression test |
A. | will always be automated |
B. | will help ensure unchanged areas of the software have not been affected |
C. | will help ensure changed areas of the software have not been affected |
D. | can only be run during user acceptance testing |
Answer» B. will help ensure unchanged areas of the software have not been affected |
31. |
If an expected result is not specified then: |
A. | we cannot run the test |
B. | it may be difficult to repeat the test |
C. | it may be difficult to determine if the test has passed or failed |
D. | we cannot automate the user inputs |
Answer» C. it may be difficult to determine if the test has passed or failed |
32. |
Which of the following is not a static testing technique |
A. | error guessing |
B. | walkthrough |
C. | data flow analysis |
D. | inspections |
Answer» A. error guessing |
33. |
Which of the following statements about component testing is not true? |
A. | component testing should be performed by development |
B. | component testing is also known as isolation or module testing |
C. | component testing should have completion criteria planned |
D. | component testing does not involve regression testing |
Answer» D. component testing does not involve regression testing |
34. |
During which test activity could faults be found most cost effectively? |
A. | execution |
B. | design |
C. | planning |
D. | check exit criteria completion |
Answer» C. planning |
35. |
The purpose of requirement phase is |
A. | to freeze requirements |
B. | to understand user needs |
C. | to define the scope of testing |
D. | all of the above |
Answer» D. all of the above |
36. |
Which, in general, is the least required skill of a good tester? |
A. | being diplomatic |
B. | able to write software |
C. | having good attention to detail |
D. | able to be relied on |
Answer» B. able to write software |
37. |
The process starting with the terminal modules is called |
A. | top-down integration |
B. | bottom-up integration |
C. | none of the above |
D. | module integration |
Answer» B. bottom-up integration |
38. |
The inputs for developing a test plan are taken from |
A. | project plan |
B. | business plan |
C. | support plan |
D. | none of the above |
Answer» A. project plan |
39. |
Function/Test matrix is a type of |
A. | interim test report |
B. | final test report |
C. | project status report |
D. | management report |
Answer» C. project status report |