McqMate
| Q. |
Where does the granular molding material get loaded into? |
| A. | barrel |
| B. | hopper |
| C. | pellets |
| D. | split |
| Answer» B. hopper | |
| Explanation: in a ram or plunger type injection molding system, the granular molding material has to be first loaded into a hopper, after which, with the help of a feeding device it gets metered out inside a cylinder. | |
View all MCQs in
Manufacturing Technology 1No comments yet