

McqMate
Q. |
Where does the granular molding material get loaded into? |
A. | barrel |
B. | hopper |
C. | pellets |
D. | split |
Answer» B. hopper | |
Explanation: in a ram or plunger type injection molding system, the granular molding material has to be first loaded into a hopper, after which, with the help of a feeding device it gets metered out inside a cylinder. |
View all MCQs in
Manufacturing Technology 1No comments yet