I'm working on a project where the soil is soft, cohesive clay with high plasticity, and preliminary tests indicate potential for significant consolidation settlement over time. I've considered using shallow foundations with soil improvement techniques like preloading, but I'm not sure if that's sufficient for a heavy warehouse load. My geotechnical report suggests a settlement limit of 50mm, and I need to ensure the foundation design meets this without excessive costs.
To minimize settlement in soft clay soils for a warehouse foundation, consider these best practices:
Always consult with a licensed geotechnical engineer for site-specific recommendations.