McqMate
Q. |
A spoil bank is formed when the |
A. | canal has steel bed slope |
B. | canal section is too large |
C. | volume of excavation is in excess of the embankment filling |
D. | canal alignment is meandrous |
Answer» C. volume of excavation is in excess of the embankment filling |
View all MCQs in
Irrigation EngineeringNo comments yet