

McqMate
Q. |
Which of the following methods are used for system analysis |
A. | Linear programming |
B. | Waiting line model |
C. | Simulation model |
D. | All of the above |
E. | None of the above |
Answer» D. All of the above |
View all MCQs in
Industrial EngineeringNo comments yet