Mechanical Engineering
→
Total Quality Management (TQM)
→
What is the value at the position of (II...
Q.
What is the value at the position of (III)?
A.
0.04
B.
0.85
C.
0.15
D.
0.033
Answer» B. 0.85
1.6k
0
Do you find this helpful?
12
View all MCQs in
Total Quality Management (TQM)
Discussion
No comments yet
Login to comment
Related MCQs
What is the value at the position of (V)?
Consider that for a process s bar (average standard deviation of 50 samples each of size 4) is found to be 10.04. The value of c4 (corresponding to sample size of .4) is .92. What is the estimated value of process standard deviation?
Given that for the three samples, the value of R bar is .66 and value of d2 corresponding to three is1.128, what is the estimated standard deviation?
Consider that for a particular process, the p has shifted to .4 and the process has gone out of control. The corresponding value of beta is found to be .3356. The value of Average Run Length is:
Consider for a process in control, the value of alpha is .0015. What is the value of the average run length?
To determine whether the test statistic of ANOVA is statistically significant, it can be compared to a critical value. What two pieces of information are needed to determine the critical value?
You conduct a hypothesis test and you observe values for the sample mean and sample standard deviation when n = 25 that do not lead to the rejection of Ho (null hypothesis). You calculate a p-value of 0.0667. What will happen to the p-value if you observe the same sample mean and standard deviation for a sample n>25?
To determine whether the test statistic of ANOVA is statistically significant, it can be compared to a critical value. What two pieces of information are needed to determine the critical value?
Common elements of winners are i. Senior management was actively involved ii. Control of overall process iii. Focus on customer The correct order is
Continual improvement is in i. Environmental objective ii. Audit Result iii. Corrective action The correct order is