McqMate
Sign In
Hamberger menu
McqMate
Sign in
Sign up
Home
Forum
Search
Ask a Question
Sign In
McqMate Copyright © 2024
→
Civil Engineering
→
Surveying
→
Detailed plotting is generally done by
Q.
Detailed plotting is generally done by
A.
radiation
B.
traversing
C.
resection
D.
all of the above
Answer» A. radiation
2k
0
Do you find this helpful?
11
View all MCQs in
Surveying
Discussion
No comments yet
Login to comment
Related MCQs
Intersection method of detailed plotting is most suitable for
Plotting of inaccessible points on a plane table, is done by
In plane table surveying, plotting and recording of values are done simultaneously.
The method of surveying in which field work and plotting work are done simultaneously, is called
The plotting of small areas which can be commanded from a single station, is usually done on the plane table by the method of
What triangles are generally preferred to get good results in plotting?
Pick up the method of surveying in which field observations and plotting proceed simultaneously from the following
Profile levelling is usually done for determining
Direct ranging is done when the two ends of the survey lines are _______
In which of the following compass sighting and reading taking cannot be done simultaneously from one position of the observer?