Q.

Make up water is required in a cooling tower to replace the water lost by

A. Evaporation
B. Drift
C. Blowdown and leakage
D. All (A), (B) and (C)
Answer» D. All (A), (B) and (C)
1.5k
0
Do you find this helpful?
20

View all MCQs in

Mass Transfer

Discussion

No comments yet