Trowelling should be finished on the sam...
Q.
Trowelling should be finished on the same day of its laying operation.
A.
Yes
B.
No
Answer» A. Yes
5.2k
0
Do you find this helpful?
29
View all MCQs in
Concrete Technology
Discussion
No comments yet
Login to comment
Related MCQs
The finished concrete is measured in litres.
The Indian standard code specifies that the crushing strength for which the mix should be designed in the laboratory should be
The mixer, which produces a steady stream of concrete as long as it is in operation, is known as
The levelling operation that removes humps and hollows and give a true, uniform concrete surface is called
The final operation of finishing the concrete surface is called
Note more than ……. bags should be kept one above other.
The weight of residue should not exceed ……. for OPC.
Compacting factor test should be made for concrete with maximum size of aggregate not exceeding 40 mm.
The process of mixing, transporting, placing and compacting concrete should not take more than ……. min any case.
Placing of concrete should preferably be done at a temperature of