These multiple-choice questions (MCQs) are designed to enhance your knowledge and understanding in the following areas: Civil Engineering .
1. |
Concept of Quality Control depends on |
A. | Quality Control |
B. | Quality Assurance |
C. | Quality Management |
D. | All the above |
Answer» D. All the above |
2. |
__________denotes the Closeness of a measurement to its true value. |
A. | Accuracy |
B. | Precision |
C. | Calibration |
D. | Least count |
Answer» A. Accuracy |
3. |
__________of a measurement denotes its closeness to another measurement of the same quality. |
A. | Accuracy |
B. | Precision |
C. | Calibration |
D. | Least count |
Answer» B. Precision |
4. |
The process of comparing any dimension with its true value is known as ________ |
A. | Accuracy |
B. | Precision |
C. | Calibration |
D. | Least count |
Answer» C. Calibration |
5. |
Which of the following activities are not included in quality assurance? |
A. | Reliability |
B. | Ductility |
C. | Durability |
D. | Safety |
Answer» B. Ductility |
6. |
Which one of the following is not a guru of TQM? |
A. | Stewart |
B. | Deming |
C. | Newton |
D. | Juran |
Answer» C. Newton |
7. |
To achieve desirable product quality, Taguchi recommends which process? |
A. | System design |
B. | Parameter design |
C. | Tolerance design |
D. | All the above |
Answer» D. All the above |
8. |
For fineness of cement test weight of cement retained should not be more than______ |
A. | 15 % OPC & 10%RHC |
B. | 10 % OPC & 5%RHC |
C. | 5 % OPC & 10%RHC |
D. | 10 % OPC & 15%RHC |
Answer» B. 10 % OPC & 5%RHC |
9. |
What is the initial setting time & final setting time of cement? |
A. | 30 minutes & 600 minutes |
B. | 45 minutes & 600 minutes |
C. | 30 minutes & 450 minutes |
D. | 60 minutes & 300 minutes |
Answer» A. 30 minutes & 600 minutes |
10. |
Which of the following cement does not have field test? |
A. | There should not be any visible lumps |
B. | The colour of the cement should be greenish grey |
C. | Final setting time of cement is 600 minutes |
D. | When hand is inserted in cement bag it should give cool feeling. |
Answer» C. Final setting time of cement is 600 minutes |
11. |
The nominal size of brick shall be ________ |
A. | 19 x 9 x 9 cm |
B. | 20 x 10 x 10 cm |
C. | 19 x 9 x 4 cm |
D. | 20 x 10 x 4 cm |
Answer» B. 20 x 10 x 10 cm |
12. |
As per I.S size of standard brick should be _______ |
A. | 19 x 9 x 9 cm |
B. | 20 x 10 x 10 cm |
C. | 19 x 9 x 4 cm |
D. | 20 x 10 x 4 cm |
Answer» A. 19 x 9 x 9 cm |
13. |
First class bricks should not absorb more than ____% water |
A. | 15.00% |
B. | 20.00% |
C. | 25.00% |
D. | 18.00% |
Answer» B. 20.00% |
14. |
For plastering proportion of mortar cement: sand shall be __________ |
A. | 1:5 to 1:6 |
B. | 1:3 to 1:4 |
C. | 1:2 to 1:3 |
D. | 1:1 to 1:2 |
Answer» B. 1:3 to 1:4 |
15. |
For plastering new surfaces, all masonry joints should be raked to a depth of about ____ |
A. | 14 mm |
B. | 16 mm |
C. | 12 mm |
D. | 15 mm |
Answer» C. 12 mm |
16. |
Which of following does not represented quality? |
A. | Strength |
B. | Durability |
C. | Test results |
D. | All of the above |
Answer» C. Test results |
17. |
When structure have a good quality it is ___ |
A. | Architecture planning proper |
B. | Adequate testing |
C. | Workmanship should excellent |
D. | All of the above |
Answer» D. All of the above |
18. |
Which of the following steps Juran gives for Quality Control. |
A. | Evaluate actual operating performance |
B. | Compare actual performance to goals |
C. | Act on the difference |
D. | All of the above |
Answer» D. All of the above |
19. |
In which of the following includes are in civil engineering works for quality control. |
A. | Testing of materials |
B. | Inspection of finished work |
C. | Evaluation of construction method |
D. | All of the above |
Answer» D. All of the above |
20. |
In which of the following factor does not affecting for quality control. |
A. | Skill of workers |
B. | does not Supervision standards |
C. | Quality control plan |
D. | None of the above |
Answer» B. does not Supervision standards |
21. |
Which of the following benefit is not for quality control. |
A. | More inspection is required |
B. | Increased repair cost |
C. | Both of A and B |
D. | None of the above |
Answer» C. Both of A and B |
22. |
Which of the following activities are given quality assurance. |
A. | Safety |
B. | Durability |
C. | Reliability |
D. | All of the above |
Answer» D. All of the above |
23. |
Quality characteristics which are related to only conforming or non-conforming products, are called___ |
A. | Attributes |
B. | Variables |
C. | Continuous characteristics |
D. | None of the above |
Answer» A. Attributes |
24. |
Quality characteristics which are related to only dimensions or physical parameters, are called___ |
A. | Attributes |
B. | Variables |
C. | Continuous characteristics |
D. | None of the above |
Answer» B. Variables |
25. |
When record show only the number of, called ___ |
A. | Attributes |
B. | Variables |
C. | Both A and B |
D. | None of the above |
Answer» A. Attributes |
26. |
Sustainable building means that |
A. | Green building |
B. | Environmental building |
C. | Both A and B |
D. | None of the above |
Answer» C. Both A and B |
27. |
Which of the following elements should be used optimum to make a green building? |
A. | Agni |
B. | Jal |
C. | Prithvi |
D. | All of the above |
Answer» D. All of the above |
28. |
Which of the following is not the purpose of a green building? |
A. | To reduce use of water |
B. | To minimize damage of the environment |
C. | Re-use of waste materials |
D. | None of the above |
Answer» D. None of the above |
29. |
Which of the following is not an economic benefit for a green building? |
A. | 20 – 30 % energy used |
B. | 20 – 30 % less water used |
C. | Enhance asset value |
D. | None of the above |
Answer» D. None of the above |
30. |
Which of the following is not an environment benefit for a green building? |
A. | To reduce use of water |
B. | Reduce solid waste |
C. | Decrease air quality |
D. | None of the above |
Answer» C. Decrease air quality |
31. |
Which of the following is a disadvantage of green building? |
A. | Increases 15-20% cost as compared to normal building |
B. | Modern techniques are required |
C. | Experts technicians are required |
D. | All of the above |
Answer» D. All of the above |
32. |
Which of the following is not a green building component? |
A. | Water efficiency |
B. | Design efficiency |
C. | Material efficiency |
D. | None of the above |
Answer» D. None of the above |
33. |
Which of the following benefit is for green building material? |
A. | Lower cost |
B. | Reduced maintenance cost |
C. | Greater design flexibility |
D. | All of the above |
Answer» D. All of the above |
34. |
Which of the following green rating systems are currently working in India? |
A. | LEED |
B. | GRIHA |
C. | Both A and B |
D. | None of the above |
Answer» C. Both A and B |
35. |
What are the three pillars of TQM? |
A. | Vision , Team work , Communication |
B. | Foundation , Pillars , The top |
C. | Total , Quality , Management |
D. | Understanding , Improvement , Assurance |
Answer» D. Understanding , Improvement , Assurance |
36. |
Zaire proposed "building blocks of TQM"? |
A. | True |
B. | False |
C. | none |
D. | all |
Answer» A. True |
37. |
Zaire proposed "Building blocks of TQM" in which year ? |
A. | 1990 |
B. | 1991 |
C. | 1992 |
D. | 1993 |
Answer» B. 1991 |
38. |
Proposed "The house of TQM models” in which year? |
A. | 1990 |
B. | 1991 |
C. | 1992 |
D. | 1993 |
Answer» D. 1993 |
39. |
Foundation, Pillars & the top three proposed in which TQM model? |
A. | Building blocks of TQM |
B. | The house of TQM |
C. | Driving forces of TQM |
D. | Organization Structure of TQM |
Answer» A. Building blocks of TQM |
40. |
Which of the following is not included in the driving force of TQM? |
A. | Survival |
B. | Export Drive |
C. | Import |
D. | Profitability |
Answer» C. Import |
41. |
Give full form of P.D.C.A cycle |
A. | Planning , Doing , Checking , Acting |
B. | Plan , Do , Check , Act |
C. | Plan, Does , Check , Act |
D. | Plan , Do , Checks, Acts |
Answer» B. Plan , Do , Check , Act |
42. |
Who's suggested PDCA cycle? |
A. | Shewhart |
B. | Deming |
C. | Newton |
D. | Juran |
Answer» B. Deming |
43. |
In machine mixing gap between drum & blades shall not be more than ____ |
A. | 20 mm |
B. | 30 mm |
C. | 15 mm |
D. | 25 mm |
Answer» D. 25 mm |
44. |
Batching error means inaccuracy in the quantity of |
A. | Aggregates |
B. | Cement |
C. | Water |
D. | All the above |
Answer» D. All the above |
45. |
The Curing periods depends upon |
A. | Type of cement |
B. | Weather Conditions |
C. | Methods of curing |
D. | All of the above |
Answer» D. All of the above |
46. |
While compacting the concrete by a mechanical vibrator , the slump should not exceed |
A. | 2.5 cm |
B. | 7.5 cm |
C. | 5.0 cm |
D. | 10 cm |
Answer» C. 5.0 cm |
47. |
Improper curing results in |
A. | Shrinkage cracks |
B. | Loss of strength |
C. | Increase in permeability |
D. | All of the above |
Answer» D. All of the above |
48. |
When removal of form work for walls , columns and vertical faces of all structural members |
A. | 2 to 3 days |
B. | 16 to 24 hours |
C. | 8 to 12 hours |
D. | 7 days |
Answer» B. 16 to 24 hours |
49. |
Removal of props under slabs spanning upto 4.5 m |
A. | 3 days |
B. | 7 days |
C. | 14 days |
D. | 21 days |
Answer» B. 7 days |
50. |
Which is a good formwork? |
A. | Easy Removal |
B. | Economical |
C. | Less leakage |
D. | All of the above |
Answer» D. All of the above |
Done Studing? Take A Test.
Great job completing your study session! Now it's time to put your knowledge to the test. Challenge yourself, see how much you've learned, and identify areas for improvement. Don’t worry, this is all part of the journey to mastery. Ready for the next step? Take a quiz to solidify what you've just studied.