1.

Concept of Quality Control depends on

A. Quality Control
B. Quality Assurance
C. Quality Management
D. All the above
Answer» D. All the above
2.

__________denotes the Closeness of a measurement to its true value.

A. Accuracy
B. Precision
C. Calibration
D. Least count
Answer» A. Accuracy
3.

__________of a measurement denotes its closeness to another measurement of the same quality.

A. Accuracy
B. Precision
C. Calibration
D. Least count
Answer» B. Precision
4.

The process of comparing any dimension with its true value is known as ________

A. Accuracy
B. Precision
C. Calibration
D. Least count
Answer» C. Calibration
5.

Which of the following activities are not included in quality assurance?

A. Reliability
B. Ductility
C. Durability
D. Safety
Answer» B. Ductility
6.

Which one of the following is not a guru of TQM?

A. Stewart
B. Deming
C. Newton
D. Juran
Answer» C. Newton
7.

To achieve desirable product quality, Taguchi recommends which process?

A. System design
B. Parameter design
C. Tolerance design
D. All the above
Answer» D. All the above
8.

For fineness of cement test weight of cement retained should not be more than______

A. 15 % OPC & 10%RHC
B. 10 % OPC & 5%RHC
C. 5 % OPC & 10%RHC
D. 10 % OPC & 15%RHC
Answer» B. 10 % OPC & 5%RHC
9.

What is the initial setting time & final setting time of cement?

A. 30 minutes & 600 minutes
B. 45 minutes & 600 minutes
C. 30 minutes & 450 minutes
D. 60 minutes & 300 minutes
Answer» A. 30 minutes & 600 minutes
10.

Which of the following cement does not have field test?

A. There should not be any visible lumps
B. The colour of the cement should be greenish grey
C. Final setting time of cement is 600 minutes
D. When hand is inserted in cement bag it should give cool feeling.
Answer» C. Final setting time of cement is 600 minutes
11.

The nominal size of brick shall be ________

A. 19 x 9 x 9 cm
B. 20 x 10 x 10 cm
C. 19 x 9 x 4 cm
D. 20 x 10 x 4 cm
Answer» B. 20 x 10 x 10 cm
12.

As per I.S size of standard brick should be _______

A. 19 x 9 x 9 cm
B. 20 x 10 x 10 cm
C. 19 x 9 x 4 cm
D. 20 x 10 x 4 cm
Answer» A. 19 x 9 x 9 cm
13.

First class bricks should not absorb more than ____% water

A. 15.00%
B. 20.00%
C. 25.00%
D. 18.00%
Answer» B. 20.00%
14.

For plastering proportion of mortar cement: sand shall be __________

A. 1:5 to 1:6
B. 1:3 to 1:4
C. 1:2 to 1:3
D. 1:1 to 1:2
Answer» B. 1:3 to 1:4
15.

For plastering new surfaces, all masonry joints should be raked to a depth of about ____

A. 14 mm
B. 16 mm
C. 12 mm
D. 15 mm
Answer» C. 12 mm
16.

Which of following does not represented quality?

A. Strength
B. Durability
C. Test results
D. All of the above
Answer» C. Test results
17.

When structure have a good quality it is ___

A. Architecture planning proper
B. Adequate testing
C. Workmanship should excellent
D. All of the above
Answer» D. All of the above
18.

Which of the following steps Juran gives for Quality Control.

A. Evaluate actual operating performance
B. Compare actual performance to goals
C. Act on the difference
D. All of the above
Answer» D. All of the above
19.

In which of the following includes are in civil engineering works for quality control.

A. Testing of materials
B. Inspection of finished work
C. Evaluation of construction method
D. All of the above
Answer» D. All of the above
20.

In which of the following factor does not affecting for quality control.

A. Skill of workers
B. does not Supervision standards
C. Quality control plan
D. None of the above
Answer» B. does not Supervision standards
21.

Which of the following benefit is not for quality control.

A. More inspection is required
B. Increased repair cost
C. Both of A and B
D. None of the above
Answer» C. Both of A and B
22.

Which of the following activities are given quality assurance.

A. Safety
B. Durability
C. Reliability
D. All of the above
Answer» D. All of the above
23.

Quality characteristics which are related to only conforming or non-conforming products, are called___

A. Attributes
B. Variables
C. Continuous characteristics
D. None of the above
Answer» A. Attributes
24.

Quality characteristics which are related to only dimensions or physical parameters, are called___

A. Attributes
B. Variables
C. Continuous characteristics
D. None of the above
Answer» B. Variables
25.

When record show only the number of, called ___

A. Attributes
B. Variables
C. Both A and B
D. None of the above
Answer» A. Attributes
26.

Sustainable building means that

A. Green building
B. Environmental building
C. Both A and B
D. None of the above
Answer» C. Both A and B
27.

Which of the following elements should be used optimum to make a green building?

A. Agni
B. Jal
C. Prithvi
D. All of the above
Answer» D. All of the above
28.

Which of the following is not the purpose of a green building?

A. To reduce use of water
B. To minimize damage of the environment
C. Re-use of waste materials
D. None of the above
Answer» D. None of the above
29.

Which of the following is not an economic benefit for a green building?

A. 20 – 30 % energy used
B. 20 – 30 % less water used
C. Enhance asset value
D. None of the above
Answer» D. None of the above
30.

Which of the following is not an environment benefit for a green building?

A. To reduce use of water
B. Reduce solid waste
C. Decrease air quality
D. None of the above
Answer» C. Decrease air quality
31.

Which of the following is a disadvantage of green building?

A. Increases 15-20% cost as compared to normal building
B. Modern techniques are required
C. Experts technicians are required
D. All of the above
Answer» D. All of the above
32.

Which of the following is not a green building component?

A. Water efficiency
B. Design efficiency
C. Material efficiency
D. None of the above
Answer» D. None of the above
33.

Which of the following benefit is for green building material?

A. Lower cost
B. Reduced maintenance cost
C. Greater design flexibility
D. All of the above
Answer» D. All of the above
34.

Which of the following green rating systems are currently working in India?

A. LEED
B. GRIHA
C. Both A and B
D. None of the above
Answer» C. Both A and B
35.

What are the three pillars of TQM?

A. Vision , Team work , Communication
B. Foundation , Pillars , The top
C. Total , Quality , Management
D. Understanding , Improvement , Assurance
Answer» D. Understanding , Improvement , Assurance
36.

Zaire proposed "building blocks of TQM"?

A. True
B. False
C. none
D. all
Answer» A. True
37.

Zaire proposed "Building blocks of TQM" in which year ?

A. 1990
B. 1991
C. 1992
D. 1993
Answer» B. 1991
38.

Proposed "The house of TQM models” in which year?

A. 1990
B. 1991
C. 1992
D. 1993
Answer» D. 1993
39.

Foundation, Pillars & the top three proposed in which TQM model?

A. Building blocks of TQM
B. The house of TQM
C. Driving forces of TQM
D. Organization Structure of TQM
Answer» A. Building blocks of TQM
40.

Which of the following is not included in the driving force of TQM?

A. Survival
B. Export Drive
C. Import
D. Profitability
Answer» C. Import
41.

Give full form of P.D.C.A cycle

A. Planning , Doing , Checking , Acting
B. Plan , Do , Check , Act
C. Plan, Does , Check , Act
D. Plan , Do , Checks, Acts
Answer» B. Plan , Do , Check , Act
42.

Who's suggested PDCA cycle?

A. Shewhart
B. Deming
C. Newton
D. Juran
Answer» B. Deming
43.

In machine mixing gap between drum & blades shall not be more than ____

A. 20 mm
B. 30 mm
C. 15 mm
D. 25 mm
Answer» D. 25 mm
44.

Batching error means inaccuracy in the quantity of

A. Aggregates
B. Cement
C. Water
D. All the above
Answer» D. All the above
45.

The Curing periods depends upon

A. Type of cement
B. Weather Conditions
C. Methods of curing
D. All of the above
Answer» D. All of the above
46.

While compacting the concrete by a mechanical vibrator , the slump should not exceed

A. 2.5 cm
B. 7.5 cm
C. 5.0 cm
D. 10 cm
Answer» C. 5.0 cm
47.

Improper curing results in

A. Shrinkage cracks
B. Loss of strength
C. Increase in permeability
D. All of the above
Answer» D. All of the above
48.

When removal of form work for walls , columns and vertical faces of all structural members

A. 2 to 3 days
B. 16 to 24 hours
C. 8 to 12 hours
D. 7 days
Answer» B. 16 to 24 hours
49.

Removal of props under slabs spanning upto 4.5 m

A. 3 days
B. 7 days
C. 14 days
D. 21 days
Answer» B. 7 days
50.

Which is a good formwork?

A. Easy Removal
B. Economical
C. Less leakage
D. All of the above
Answer» D. All of the above

Done Studing? Take A Test.

Great job completing your study session! Now it's time to put your knowledge to the test. Challenge yourself, see how much you've learned, and identify areas for improvement. Don’t worry, this is all part of the journey to mastery. Ready for the next step? Take a quiz to solidify what you've just studied.