Q.

In performing the works test

A. the mould for test specimen should be made of non-absorbent material
B. the mould should be constructed in such a way that there is leakage of water from test specimen during moulding
C. the base plate of the mould should be of non-absorbent material
D. all of the above
Answer» D. all of the above