Q.

The borrow pits should, preferably, be taken from

A. the field on the right side of canal
B. the field on the left side of the canal
C. the central half width of the section of the canal
D. any one of the above
Answer» C. the central half width of the section of the canal
1.8k
0
Do you find this helpful?
11

View all MCQs in

Irrigation Engineering

Discussion

No comments yet