Which of the following is incorrect with reference to work study? |
| A. | Normal time = Representative time + Rating factor |
| B. | Normal time = Representative time x Rating factor |
| C. | Standard time = Normal time |
| D. | Standard time = Normal time x Allowances |
| E. | None of the above |
| Answer» B. Normal time = Representative time x Rating factor | |