Slump test is done for
Q.
Slump test is done for
A.
clay
B.
sand
C.
lime
D.
concrete
Answer» D. concrete
View all MCQs in:
Concrete Technology and Design
Discussion
Comment
Related Questions
In slump test, each layer of concrete is compacted by a steel rod 60 cm long and of 16 mm diameter for
Slump test of concrete is a measure of its
A concrete having a slump of 6.5 cm, is said to be
While compacting the concrete by a mechanical vibrator, the slump should not exceed
If the slump of a concrete mix is 60 mm, its workability is
The top diameter, bottom diameter and the height of a slump mould are:
The preliminary test is repeated if the difference of compressive strength of three test specimens, exceeds
For quality control of Portland cement, the test essentially done is
To determine the modulus of rupture, the size of test specimen used is
The individual variation between test strength of sample should not be more than
Login to Continue
It will take less than 2 minutes
Continue with Google
Continue with Linkedin
Continue with Twitter
Report MCQ
Remark*
Report