1. |
The rate of payment is made for 100 cu m (per % cu m) in case of |
A. | earth work in excavation |
B. | rock cutting |
C. | excavation in trenches for foundation |
D. | all the above |
Answer» D. all the above |
2. |
The rate of an item of work depends on |
A. | specifications of works |
B. | specifications of materials |
C. | proportion of mortar |
D. | all the above |
Answer» D. all the above |
3. |
The main factor to be considered while preparing a detailed estimate, is |
A. | quantity of the materials |
B. | availability of materials |
C. | transportation of materials |
D. | all the above |
Answer» D. all the above |
4. |
Brick walls are measured in sq. m if the thickness of the wall is |
A. | 10 cm |
B. | 15 cm |
C. | 20 cm |
D. | none of these |
Answer» A. 10 cm |
5. |
The plinth area of a building not includes |
A. | area of the walls at the floor level |
B. | internal shaft for sanitary installations up to 2 sq m. in area |
C. | lift and wall including landing |
D. | area of cantilevered porch |
Answer» D. area of cantilevered porch |
6. |
If the formation level of a highway has a uniform gradient for a particular length, and the ground is also having a longitudinal slope, the earthwork may be calculated by |
A. | mid-section formula |
B. | trapezoidal formula |
C. | prismoidal formula |
D. | all the above |
Answer» D. all the above |
7. |
A cement concrete road is 1000 m long, 8 m wide and 15 cm thick over the sub-base of 10 cm thick gravel. The box cutting in road crust is |
A. | 500 m3 |
B. | 1000 m3 |
C. | 1500 m3 |
D. | 2000 m3 |
Answer» C. 1500 m3 |
8. |
While estimating the qualities for the construction of a building, the correct metric unit is |
A. | metre for length |
B. | cubic metre for area |
C. | square metres for volume |
D. | litre for capacity |
Answer» D. litre for capacity |
9. |
The brick work is not measured in cu m in case of |
A. | one or more than one brick wall |
B. | brick work in arches |
C. | reinforced brick work |
D. | half brick wall |
Answer» D. half brick wall |
10. |
The assumption on which the trapezoidal formula for volumes is based, is |
A. | the end sections are parallel planes |
B. | the mid-area of a pyramid is half the average area of the ends |
C. | the volume of the prismoidal is over-estimated and hence a prismoidal correction is applied |
D. | all the above |
Answer» D. all the above |
11. |
In the mid-section formula |
A. | the mean depth is the average of depths of two consecutive sections |
B. | the area of mid-sections is calculated by using mean depth |
C. | the volume of the earth work is calculated by multiplying the mid-section area by the distance between the two original sections |
D. | all of the above |
Answer» D. all of the above |
12. |
Pick up the correct statement from the following: |
A. | the earth work of cutting in trenches or borrow pits in fairly uniform ground is measured with the help of average depths of the dead men |
B. | the earth work in trenches or borrow pits in irregular ground is measured by taking the difference in levels before and after completion of work |
C. | the earth work in trenches or borrow pits, where neither a nor b is feasible, are measured from the fillings after deduction of voids |
D. | all the above |
Answer» D. all the above |
13. |
The cross-sections for a highway is taken at |
A. | right angle to the centre line |
B. | 30 metres apart |
C. | intermediate points having abrupt change in gradient |
D. | all the above |
Answer» D. all the above |
14. |
Referring of given figure, pick up the correct statement from the following: |
A. | the total length of centre line of four walls is 20 m |
B. | length of long wall out-to-out is 6.80 m |
C. | length of short walls in-to-in is 3.20 m |
D. | all the above |
Answer» D. all the above |
15. |
According to Indian Standards Institute, the actual size of modular bricks is |
A. | 23 cm × 11.5 cm × 7.5 cm |
B. | 25 cm × 13 cm × 7.5 cm |
C. | 19 cm × 9 cm × 9 cm |
D. | 20 cm × 10 cm × 10 cm |
Answer» C. 19 cm × 9 cm × 9 cm |
16. |
The following item of earth work is not measured separately. |
A. | setting out of works |
B. | site clearance |
C. | steps in deep excavation |
D. | all the above |
Answer» D. all the above |
17. |
The measurement is made in square metre in case of |
A. | cement concrete in foundation |
B. | r.c.c. structure |
C. | hollow concrete block wall |
D. | none of these |
Answer» D. none of these |
18. |
Cost of fittings and their fixing is specified for the following sanitary fittings |
A. | water closets |
B. | flushing pipes |
C. | lavatory basins |
D. | all the above |
Answer» D. all the above |
19. |
The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as |
A. | excavation |
B. | surface dressing |
C. | cutting |
D. | surface excavation |
Answer» D. surface excavation |
20. |
For the construction of buildings, the subheads of the estimate are |
A. | earthwork, concrete work, brick work |
B. | brickwork, stone work, roofing |
C. | brickwork flooring, wood work, steel work |
D. | all the above |
Answer» D. all the above |
21. |
Pick up the correct statement from the following: |
A. | pointing is measured in sq.m |
B. | plastering is measured in sq.m |
C. | glazing is measured in sq.m |
D. | all the above |
Answer» D. all the above |
22. |
The cross-section of a road partly in banking and partly in cutting is shown in the given figure. The area of the shaded portion is |
A. | b - rd)²/(r - s) |
B. | b - rd)²/(r + s) |
C. | ½ × (b + rd)²/(r - s) |
D. | b - rd)²/(s - r) |
Answer» A. b - rd)²/(r - s) |
23. |
Pick up the correct statement from the following: |
A. | if the bed level is above n.s.l. the canal is called fully in baking and the berms are designed as 3 d where d is full supply depth of water (f.s.d.) |
B. | area of canal in cutting = bd + sd 2 where b = bed width, d = depth of cutting and s is the side slope |
C. | if f.s.l. is above n.s.l the canal is called partly in cutting and partly in filling and berms are designed as 2d where d is full supply depth |
D. | all the above |
Answer» D. all the above |
24. |
Pick up the incorrect statement from the following: |
A. | no deduction is made for the volume occupied by reinforcement |
B. | no deduction is made for the openings upto 0.1 sq.m |
C. | no deduction is made for volumes occupied by pipes, not exceeding 100 sq.cm in crosssection |
D. | none of these |
Answer» D. none of these |
25. |
The value of 'B' of Indian type W.C. shown in the given figure is: |
A. | 45 cm |
B. | 50 cm |
C. | 30 cm |
D. | 25 cm |
Answer» A. 45 cm |
26. |
Pick up the excavation where measurements are made in square metres for payment. |
A. | ordinary cuttings up to 1 m |
B. | surface dressing up to 15 cm depths |
C. | surface excavation up to 30 cm depths |
D. | both (b) and (c) |
Answer» D. both (b) and (c) |
27. |
As per Indian Standard Specifications, the peak discharge for domestic purposes per capita per minute, is taken |
A. | 1.80 litres for 5 to 10 users |
B. | 1.20 litres for 15 users |
C. | 1.35 for 20 users |
D. | all the above |
Answer» D. all the above |
28. |
In long and short wall method of estimation, the length of long wall is the centre to centre distance between the walls and |
A. | breadth of the wall |
B. | half breadth of wall on each side |
C. | one fourth breadth of wall on each side |
D. | none of these |
Answer» B. half breadth of wall on each side |
29. |
The expected out turn of cement concrete 1 : 2 : 4 per mason per day is |
A. | 1.5 m3 |
B. | 2.5 m3 |
C. | 3.5 m3 |
D. | 5.0 m3 |
Answer» D. 5.0 m3 |
30. |
The value of 'C' of Indian type W.C. shown in the given figure is: |
A. | 400 mm |
B. | 450 mm |
C. | 500 mm |
D. | 550 mm |
Answer» C. 500 mm |
31. |
The area is measured correct to the nearest |
A. | 0.01 sqm |
B. | 0.02 sqm |
C. | 0.03 sqm |
D. | 0.04 sqm |
Answer» A. 0.01 sqm |
32. |
The measurement is not made in square metres in case of |
A. | d.p.c. (damp proof course) |
B. | form works |
C. | concrete jeffries |
D. | r.c. chhajja |
Answer» D. r.c. chhajja |
33. |
The value of 'A' of Indian type W.C. shown in the given figure is: |
A. | 25 cm |
B. | 30 cm |
C. | 40 cm |
D. | 45 cm |
Answer» B. 30 cm |
34. |
The trap which is provided to disconnect the house drain from the street sewer is called |
A. | master trap |
B. | intercepting trap |
C. | interception manhole |
D. | all the above |
Answer» D. all the above |
35. |
Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds |
A. | 2.0 % |
B. | 2.5 % |
C. | 4.0 % |
D. | 5.0 % |
Answer» D. 5.0 % |
36. |
The cost of the earthwork in excavation for the surface drain of cross-section shown in the given figure for a total length of 5 metres @ Rs. 450% cum, is |
A. | rs. 400 |
B. | rs. 425 |
C. | rs. 450 |
D. | rs. 500 |
Answer» C. rs. 450 |
37. |
The expected out turn of 2.5 cm cement concrete floor per mansion per day |
A. | 2.5 sqm |
B. | 5.0 sqm |
C. | 7.5 sqm |
D. | 10 sqm |
Answer» C. 7.5 sqm |
38. |
Pick up the correct statement from the following: |
A. | the bent up bars at a support resist the negative bending moment |
B. | the bent up bars at a support resist the sharing force |
C. | the bending of bars near supports is generally at 45° |
D. | all the above |
Answer» D. all the above |
39. |
While preparing a detailed estimate |
A. | dimension should be measured correct to 0.01 m |
B. | area should be measured correct to 0.01 sqm |
C. | volume should be measured correct to 0.01 cum |
D. | all the above |
Answer» D. all the above |
40. |
The item of the brick structure measured in sq.m, is |
A. | reinforced brick work |
B. | broken glass coping |
C. | brick edging |
D. | brick work in arches |
Answer» B. broken glass coping |
41. |
The most reliable estimate is |
A. | detailed estimate |
B. | preliminary estimate |
C. | plinth area estimate |
D. | cube rate estimate |
Answer» A. detailed estimate |
42. |
According to ISI method of measurement, the order of the sequence is |
A. | length, breadth, height |
B. | breadth, length, height |
C. | height, length, breadth |
D. | none of these |
Answer» A. length, breadth, height |
43. |
Anti-siphonage pipe is connected to |
A. | main soil pipe |
B. | bottom of p trap w.c. |
C. | top of p trap w.c. |
D. | side of water closet |
Answer» C. top of p trap w.c. |
44. |
Pick up the correct statement from the following: |
A. | in a gully trap, a water seal of 6 to 7.5 cm is provided |
B. | the gully trap collects waste water from the kitchen, sink, wash basins, etc. |
C. | the gully trap disconnects the sullage drain from the main drainage system |
D. | the grating provided over gully traps is 23 cm square |
Answer» B. the gully trap collects waste water from the kitchen, sink, wash basins, etc. |
45. |
Pick up the correct statement from the following: |
A. | bricks are paid per thousand |
B. | cement is paid per 50 kg bag |
C. | lime is paid per quintal |
D. | all the above |
Answer» D. all the above |
46. |
Pick up the correct statement from the following: |
A. | all pipes and fittings are classified according to their diameters |
B. | the diameter of the pipes is the nominal diameter of internal bore |
C. | all pipes are measured along the centre line of the pipes in metres |
D. | all the above |
Answer» D. all the above |
47. |
Pick up the correct statement in case of water supply. |
A. | pipes laid in trenches and pipes fixed to walls are measured separately |
B. | cutting through walls and floors are included with the item |
C. | pipes are classified according to their sizes and quality |
D. | all the above |
Answer» D. all the above |
48. |
The concrete work for the following part of the building of specified thickness is measured in square metres |
A. | root slabs |
B. | floors |
C. | wall panels |
D. | all the above |
Answer» D. all the above |
49. |
The expected out turn of 12 mm plastering with cement mortar is |
A. | 2.5 sq m |
B. | 4.0 sq m |
C. | 6.0 sq m |
D. | 8.0 sq m |
Answer» D. 8.0 sq m |
50. |
The total length of a cranked bar through a distance (d) at 45° in case of a beam of effective length L, is |
A. | l + 0.42 d |
B. | l + (2 × 0.42 d) |
C. | l - (0.42 d) |
D. | l - (2 × 0.4 d) |
Answer» B. l + (2 × 0.42 d) |
Done Studing? Take A Test.
Great job completing your study session! Now it's time to put your knowledge to the test. Challenge yourself, see how much you've learned, and identify areas for improvement. Don’t worry, this is all part of the journey to mastery. Ready for the next step? Take a quiz to solidify what you've just studied.