McqMate Search

Search Results

MCQs

The time with which direct cost does not reduce with the increase in time is known as
The time by which an activity may be delayed without affecting any subsequent activity is called _________.
The time for which the data is to be on the BUS is affected by                       
The time during which a machine remains waiting or vacant in sequencing problem is called time.
The time for which a piece of equipment operates is called
The time for which a process has been receiving service from the processor is
The time by which an activity can be rescheduled without affecting the other activities - preceding or succeeding is called as
The time by which a particular activity can be delayed without affecting the preceding and succeeding activities is known as
The time by which activity completion time can be delayed without affecting the start of succeeding activities, is known as
The time interval over which the received signal may be sampled without error may be explained by
The time frame for which an insurance policy provides coverage is known as ________
The time period after which the interest is added each time to form a new principle is called
The time period during which a computer is malfunctioning or not operating correctly due to machine failures is referred as
The time interval after which the motion is repeated itself is known as ___________ .
The time frame for which an insurance policy provides coverage is known as___________________
The time period during which penetrant remains on the surface of the test piece is called:
The time period for which the plasma concentration of drug remains above minimum effective concentration is known as ______________
The time which results in the leasi, possible construction cost of an activity, is known as
The time frame for which an insurance policy provides coverage is known as ________
The time table of railway, and airline which defines arrival and departure can be considered as