Q. |
If in a software system, the operation is incorrect if results are not produced accor- ding to the specified timing requirements then the software system is referred as |
A. | Soft real time system |
B. | Hard real time system |
C. | Real time system |
D. | None of these |
Answer» A. Soft real time system |
Login to Continue
It will take less than 2 minutes