Q. |
Consider the first method of p bar estimation where each sample is of varying size. If the 3rd sample has p bar =.01, and the sample size of the 3rd sample is 10, what will be the upper control limit for the 3rd sample? |
A. | 0.5 |
B. | 0.6 |
C. | 0.1 ((p bar + 3∗ √p bar∗ (1-p bar)/n) is a measure of the upper control limit) |
D. | None of the above |
Answer» C. 0.1 ((p bar + 3∗ √p bar∗ (1-p bar)/n) is a measure of the upper control limit) |