McqMate
| Q. |
If a is average number of peaks more than 10 mm of unevenness per kilometre, b is average number peaks more than 6 mm for gauge variation per kilometre and c is average number of peaks more than 2 mm twist per metre, then composite current recording index (Ic), as recommended by Indian Northern Railways, is |
| A. | Ic = 10 - a - b - c/4 |
| B. | Ic = 20 - a - b - c/4 |
| C. | Ic = 30 - a - b - c/4 |
| D. | Ic = 40 - a - b - c/4 |
| Answer» D. Ic = 40 - a - b - c/4 | |
View all MCQs in
Railway Bridge and Tunnel EngineeringNo comments yet