

McqMate
Q. |
In permanent way, ballast |
A. | Transfers load from sleepers to the formation |
B. | Provides an elastic bed to the track |
C. | Provides a drainage of track |
D. | All the above |
Answer» D. All the above |
View all MCQs in
Railway Bridge and Tunnel EngineeringNo comments yet