McqMate
| Q. |
In permanent way, ballast |
| A. | Transfers load from sleepers to the formation |
| B. | Provides an elastic bed to the track |
| C. | Provides a drainage of track |
| D. | All the above |
| Answer» D. All the above | |
View all MCQs in
Railway Bridge and Tunnel EngineeringNo comments yet