Q.
Number of piles required to support a column, is
A.
1
B.
2
C.
3
D.
4
Answer» C. 3
584
0
Do you find this helpful?
5
View all MCQs in
Geotechnical Engineering
Discussion
No comments yet
Login to comment
Related MCQs
Negative skin friction on piles
The minimum centre to centre distance of friction piles of 1 m diameter, is
A structure is erected on an impervious clay whose thickness is 12 m. Drainage is possible both at upper and lower surfaces. Coefficient of consolidation is 0.015 cm2 per minute. For attaining 50% consolidation with a time factor 0.20, the number of days required
If Nf, Nd and H are total number flow channels, total number of potential drops and total hydraulic head differences respectively, the discharge q through the complete flow is given by (where K is a constant)
For a homogeneous earth dam 50 m high having 2 m free broad, a flow net was constructed and the results were : Number of potential drops = 2.4 Number of flow channels = 0.4. If co - efficiency of permeability of the dam material is 3 × 10-3 cm3/sec, the discharge per metre length of dam, is
A stratum of clay 2 m thick will get consolidated 80% in 10 years. For the 80% consolidation of 8 m thick stratum of the same clay, the time required is
Total number of stress components at a point within a soil mass loaded at its boundary is
For a clay slope of height of 10 m, the stability number is 0.05, = 2.0 t/m3, C = 2.5 t/m2, the critical height of the slope of the soil, is