McqMate
| Q. |
In concrete walls, construction joints should be provided at the |
| A. | floor level |
| B. | soffit level of lintels |
| C. | sill level of windows |
| D. | all of these |
| Answer» D. all of these | |
View all MCQs in
Concrete TechnologyNo comments yet