Under normal circumstances, the beam soffits may be removed after
A.
2 days
B.
7 days
C.
14 days
D.
21 days
Answer» B. 7 days
1.5k
0
Do you find this helpful?
10
View all MCQs in
Concrete Technology
Discussion
No comments yet
Login to comment
Related MCQs
The cement concrete, from which entrained air and excess water are removed after placing it in position, is called ________
The cement concrete, from which entrained air and excess water are removed after placing it in position, is called
If L1=Measurement taken after 24 hours of immersion in water at a temp. of 27 ± 20oC and L2=Measurement taken after 3 hours of immersion in water at boiling temperature. Then what is soundness of cement?
Vertical sides of columns may be stripped after
If the stress is removed, the specimen shows an instantaneous recovery strain ___ the elastic strain on loading.
____ Cement is used for formwork that can be removed earlier and reused in other areas which save the cost of formwork.
The 'first-in, first-out' rule should eb applied when cement hags are to be removed from the ware-house.
Cement used for normal concrete construction, is obtained by burning a mixture of
The percentage of water for making a cement paste of normal consistency varies from
To perform the soundness test, the water is added to the cement at the rate of 0.72 P by weight of cement, where P is the percentage of water required for normal consistency paste.