A batter of 1 in 12 may be given to the ...
Q.
A batter of 1 in 12 may be given to the retaining wall on the outside.
A.
Correct
B.
Incorrect
Answer» A. Correct
624
0
Do you find this helpful?
12
View all MCQs in
Highway Engineering
Discussion
No comments yet
Login to comment
Related MCQs
Retaining wall is constructed usually on the
For walls less than 6 m in height, the thickness of the retaining wall at the bottom is equal to
For walls more than 6 m in height, thickness of retaining wall at the bottom is equal to 0.4 times the height plus
A wall constructed to retain the earth from slippage on the hill side of the roadway is called
The height of the parapet wall is usually kept as
The thickness of the parapet wall, on the valley side of the roadway, is usually kept as
A breast wall is usually constructed on the hill side of the roadway.
The design capacity of the road may be defined as the
The transverse joint may be a
Traffic-actuated signals may be