According to Merrick’s multiple piece rate system, the piece rate applicable to a worker with an efficiency of 100 % or above is _____ of normal piece rate |
| A. | 100% |
| B. | 110% |
| C. | 120% |
| D. | 150% |
| Answer» C. 120% | |