| Q. |
Which model is used during early stages of the system design after the requirements have been established? |
| A. | an application-composition model |
| B. | a post-architecture model |
| C. | a reuse model |
| D. | an early design model |
| Answer» D. an early design model | |
| Explanation: estimates are based on function points, which are then converted to number of lines of source code. the formula follows the standard form discussed above with a simplified set of seven multipliers. | |