Q.

Which model is used during early stages of the system design after the requirements have been established?

A. an application-composition model
B. a post-architecture model
C. a reuse model
D. an early design model
Answer» D. an early design model
Explanation: estimates are based on function points, which are then converted to number of lines of source code. the formula follows the standard form discussed above with a simplified set of seven multipliers.