McqMate
Sign In
Hamberger menu
McqMate
Sign in
Sign up
Home
Forum
Search
Ask a Question
Sign In
McqMate Copyright © 2026
→
Civil Engineering
→
Concrete Technology and Design
→
Sand requiring a high water cement ratio...
Q.
Sand requiring a high water cement ratio, belongs to
A.
zone i
B.
zone ii
C.
zone iii
D.
zone iv
Answer» A. zone i
1.9k
0
Do you find this helpful?
13
View all MCQs in
Concrete Technology and Design
Discussion
No comments yet
Login to comment
Related MCQs
If the depth of moist sand in a cylinder is 15 cm and the depth of the sand when fully inundated with water is 12 cm, the bulking of the moist sand, is
Separation of water or water sand cement from a freshly concrete, is known
If the various concrete ingredients i.e. cement, sand and aggregates are in the ratio of 1:3:6, the grade of concrete, is
The ratio of various ingredients (cement, sand, aggregates) in concrete of grade M 200, is
As compared to ordinary Portland cement, high alumina cement has
Water cement ratio is generally expressed in volume of water required per
For a concrete mix 1:3:6 and water cement ratio 0.6 both by weight, the quantity of water required per bag, is
If 50 kg of fine aggregates and 100 kg of coarse aggregates are mixed in a concrete whose water cement ratio is 0.6, the weight of water required for harsh mix, is
For given workability the grading requiring the least amount of water is one that gives
The lower water cement ratio in concrete, introduces