McqMate
Login
Register
Home
Search
Login
Register
Computer Science Engineering (CSE)
Software Engineering
Which level of CMM is for process manage...
Q.
Which level of CMM is for process management?
A.
Initial
B.
Repeatable
C.
Defined
D.
Optimizing
Answer» D. Optimizing
View all MCQs in:
Software Engineering
Discussion
Comment
Related Questions
Which level of CMM is for basic project management?
CMM level 1 has
CMM model is a technique to
Total numbers of maturing levels in CMM are
CMM stands for
CMM was developed at
Each maturity model is CMM has
KPA in CMM stands for
CMM stands for
Match the following: A- Formal mathematical transformation: B- Formal process model: C-Formal Specifications: D-Formal System development: 1- Here the formal mathema- tical representation of the system takes place. 2- It is a starting point for process analysis. It is abstract and only defines the principal process activities and deliverables. 3-Specifications expressed in a language whose vocabulary, syntax and semantics are formally defined. 4-It is more common to waterfall model, but here the development process is based on formal mathematical transformation of a system specification to an exactable program.
Login to Continue
It will take less than 2 minutes
Continue with Google
Continue with Linkedin
Continue with Twitter
Report MCQ
Remark*
Report