Optimal solution is a feasible solution (not necessarily basic ) which minimizes the ‐‐‐‐‐‐‐‐‐‐ |
A. | Time taken |
B. | Partial cost |
C. | Total cost |
D. | None of the above |
Answer» C. Total cost |