McqMate
| Q. |
Contour trenching is performed to |
| A. | Control the landslide from the hill face |
| B. | Conserve the moisture |
| C. | Both (a) & (b) |
| D. | None of these |
| Answer» B. Conserve the moisture | |
View all MCQs in
Agricultural EngineeringNo comments yet