McqMate
Sign In
Hamberger menu
McqMate
Sign in
Sign up
Home
Forum
Search
Ask a Question
Sign In
McqMate Copyright © 2025
→
Civil Engineering
→
Concrete Technology
→
A mix with water-cement ratio of 0.78 is...
Q.
A mix with water-cement ratio of 0.78 is termed as wet mix.
A.
Yes
B.
No
Answer» A. Yes
1.4k
0
Do you find this helpful?
14
View all MCQs in
Concrete Technology
Discussion
No comments yet
Login to comment
Related MCQs
When the concrete mix is too wet, it causes
The process of consolidating concrete mix after placing it in position is termed as
The surface moisture of aggregates increases the water-cement ratio in the mix and thus
The ratio of different ingredients (cement, sand and aggregate) in concrete mix of grade M 20 is
Workability of concrete mix having very low water-cement ratio should be obtained by
If 50 kg of fine aggregates and 100 kg of coarse aggregates are mixed in a concrete whose water-cement ratio is 0.6, the weight of water required for harsh mix is
What is wet process?
Which cement is used to store for longer duration in wet climatic conditions?
In the manufacture of cement, the dry or wet mixture of calcareous and argillaceous materials is burnt in a
In the manufacture of cement, the dry or wet mixture of calcareous and argillaceous materials is burnt at a temperature between