The preliminary test is always conducted...
Q.
The preliminary test is always conducted in the field.
A.
Agree
B.
Disagree
Answer» B. Disagree
2.7k
0
Do you find this helpful?
30
View all MCQs in
Concrete Technology
Discussion
No comments yet
Login to comment
Related MCQs
The preliminary test should be repeated if the difference of compressive strength of three test specimens exceeds
Each layer of concrete placed in the mould, in preliminary test, is compacted 25 times with a 20 mm diameter rod and 60 cm in length
In performing preliminary test
In preliminary test, the concrete is placed in the mould in
The test conducted in the laboratory on the specimen made out of trial concrete mix is called
The concrete in which preliminary tests are performed for designing the mix is called
The concrete in which no preliminary tests are performed for designing the mix is called
To measure workability of concrete in field …………….test is used.
Pick up the incorrect statement applicable to the field test of good cement.
During field test, the cement is said to be pure and of good quality when