McqMate
| Q. |
A canal head work in rocky stage of a river is not suitable because |
| A. | more cross drainage works are required |
| B. | a costly head regulator is required |
| C. | more falls are necessary to dissipate the energy |
| D. | all of the above |
| Answer» D. all of the above | |
View all MCQs in
Irrigation EngineeringNo comments yet