Q. |
Prime cost may be correctly defined as |
A. | the sum of direct materials and direct labour cost with all other costs excluded |
B. | the total of all cost item |
C. | the total cost incurred in producing a finished unit |
D. | none of the above |
Answer» A. the sum of direct materials and direct labour cost with all other costs excluded |