

McqMate
Q. |
To design a cross-over between parallel tracks, the required components are: |
A. | two switch points, two acute angle crossings and two check rails |
B. | two switch points, two acute angle crossings and four check rails |
C. | two switch points, two acute angle crossings and six check rails |
D. | none of these |
Answer» B. two switch points, two acute angle crossings and four check rails |
View all MCQs in
Railway EngineeringNo comments yet