1. |
What are the Testing Levels? |
A. | unit testing |
B. | integration testing |
C. | system testing and acceptance testing. |
D. | all the above |
Answer» D. all the above |
2. |
Defect Management process does not include |
A. | defect prevention |
B. | deliverable base-lining |
C. | management reporting |
D. | none of the above |
Answer» B. deliverable base-lining |
3. |
Software testing accounts to what percent of software development costs? |
A. | 10-20 |
B. | 40-50 |
C. | 70-80 |
D. | 5-10 |
Answer» B. 40-50 |
4. |
How much testing is enough |
A. | this question is impossible to answer |
B. | the answer depends on the risks for your industry, contract and special requirements |
C. | the answer depends on the maturity of your developers |
D. | the answer should be standardized for the software development industry |
Answer» B. the answer depends on the risks for your industry, contract and special requirements |
5. |
Which of the following is not a characteristic for Testability? |
A. | operability |
B. | observability |
C. | simplicity |
D. | robustness |
Answer» D. robustness |
6. |
Which of these can be successfully tested using Loop Testing methodology? |
A. | simple loops |
B. | nested loops |
C. | concatenated loops |
D. | all of the above |
Answer» D. all of the above |
7. |
Inspections can find all the following except |
A. | variables not defined in the code |
B. | spelling and grammar faults in the documents |
C. | requirements that have been omitted from the design documents |
D. | how much of the code has been covered |
Answer» D. how much of the code has been covered |
8. |
When a new testing tool is purchased, it should be used first by: |
A. | a small team to establish the best way to use the tool |
B. | everyone who may eventually have some use for the tool |
C. | the independent testing team |
D. | the vendor contractor to write the initial scripts |
Answer» A. a small team to establish the best way to use the tool |
9. |
Which one of the following are non-functional testing methods? |
A. | system testing |
B. | usability testing |
C. | performance testing |
D. | both b & c |
Answer» D. both b & c |
10. |
During the software development process, at what point can the test process start? |
A. | when the code is complete. |
B. | when the design is complete |
C. | when the software requirements have been approved |
D. | when the first code module is ready for unit testing |
Answer» C. when the software requirements have been approved |
11. |
Acceptance test cases are based on what? |
A. | requirements |
B. | design |
C. | code |
D. | decision table |
Answer» A. requirements |
12. |
Independent Verification & Validation is |
A. | done by the developer |
B. | done by the test engineers |
C. | done by management |
D. | done by an entity outside the project’s sphere of influence |
Answer» D. done by an entity outside the project’s sphere of influence |
13. |
Which of the following is not described in a unit test standard? |
A. | syntax testing |
B. | equivalence partitioning |
C. | stress testing |
D. | modified condition/decision coverage |
Answer» C. stress testing |
14. |
Which of the following is a form of functional testing? |
A. | boundary value analysis |
B. | usability testing |
C. | performance testing |
D. | security testing |
Answer» A. boundary value analysis |
15. |
Test cases are designed during: |
A. | test recording |
B. | test planning |
C. | test configuration |
D. | test specification |
Answer» D. test specification |
16. |
Which of the following is not a major task of Exit criteria? |
A. | checking test logs against the exit criteria specified in test planning. |
B. | logging the outcome of test execution. |
C. | assessing if more tests are needed. |
D. | writing a test summary report for stakeholders. |
Answer» B. logging the outcome of test execution. |
17. |
Reviewing the test Basis is a part of which phase |
A. | test analysis and design |
B. | test implementation and execution |
C. | test closure activities |
D. | evaluating exit criteria and reporting |
Answer» A. test analysis and design |
18. |
Reporting Discrepancies as incidents is a part of which phase :- |
A. | test analysis and design |
B. | test implementation and execution |
C. | test closure activities |
D. | evaluating exit criteria and reporting |
Answer» B. test implementation and execution |
19. |
Which of the following items would not come under Configuration Management? |
A. | operating systems |
B. | test documentation |
C. | live data |
D. | user requirement document |
Answer» C. live data |
20. |
Handover of Test-ware is a part of which Phase |
A. | test analysis and design |
B. | test planning and control |
C. | test closure activities |
D. | evaluating exit criteria and reporting |
Answer» C. test closure activities |