In a project, the common parameters are cost, schedule, and quality. In relationship to the others, quality should be ranked ______________. |
| A. | first as the prime driver for a project |
| B. | second behind cost but ahead of schedule |
| C. | second behind schedule but ahead of cost |
| D. | equal to cost and schedule |
| Answer» D. equal to cost and schedule | |