The basic decision rule on acceptance of special contracts is: |
| A. | Accept the special contract if additional fixed costs can be covered by contribution from other products |
| B. | Accept the special contract if the additional revenue from the contract exceeds the fixed costs of manufacture |
| C. | Accept the special contract if it produces a positive contribution to fixed costs |
| D. | Accept the special contract if it produces a positive contribution to variable costs |
| Answer» C. Accept the special contract if it produces a positive contribution to fixed costs | |