McqMate
Login
Register
Home
Search
Login
Register
Civil Engineering
Construction Quality Control and Monitor...
One or more items taken from a quantity ...
Q.
One or more items taken from a quantity is called___
A.
Sample
B.
Lot
C.
Sample size
D.
Lot size
Answer» A. Sample
View all MCQs in:
Construction Quality Control and Monitoring
Discussion
Comment
Related Questions
In a group of similar items, any one item is called___
A collection of many items is called ____
Total number of items in a lot is called ____
The number of items in a sample is called___
Batching error means inaccuracy in the quantity of
What is the sampling fraction is that for lot of bricks 500, a sample of 10 bricks is taken.
For fineness of cement test weight of cement retained should not be more than______
First class bricks should not absorb more than ____% water
In machine mixing gap between drum & blades shall not be more than ____
Bricks absorbing more than _____ water should be rejected
Login to Continue
It will take less than 2 minutes
Continue with Google
Continue with Linkedin
Continue with Twitter
Report MCQ
Remark*
Report