McqMate
| Q. |
If the R.L's of canal bed level and high flood level of drainage are 212.0 m and 210.0 m respectively, then cross drainage work will be |
| A. | aqueduct |
| B. | superpassage |
| C. | syphon |
| D. | syphon aqueduct |
| Answer» C. syphon | |
View all MCQs in
Irrigation EngineeringNo comments yet