McqMate
| Q. |
When the pile is required to penetrate beds of hard soil or soft rock to reach its required depth, the best method od driving the pile is by |
| A. | drop hammer |
| B. | steam hammer |
| C. | water jets |
| D. | boring |
| Answer» D. boring | |
View all MCQs in
Building ConstructionNo comments yet