In CBR test, the value of CBR is calculated at |
A. | 2.5 mm penetration only |
B. | 5 mm penetration only |
C. | both 2.5 and 5 mm penetration |
D. | none of these |
Answer» C. both 2.5 and 5 mm penetration |