Q.
During the detailed survey of a hill road, the first operation is to fix the bench marks.
A.
True
B.
False
Answer» A. True
896
0
Do you find this helpful?
7
View all MCQs in
Highway Engineering
Discussion
No comments yet
Login to comment
Related MCQs
In detailed survey of a hill road, the interval for plotting the contours at sharp curves is generally
The longitudinal levels, in detailed survey of a hill road, should be taken at
According to IRC : 52-1973, the first stage for fixing up alignment of a hill road is
If R is the radius of curvature of a hill road, the maximum grade compensation (in percentage) is equal to
A track of width 1 to 1.2 m constructed along the selected alignment to facilitate access to the area for inspection and detailed survey is known as
The size of a stone used on a road must be in due proportion to the space occupied by a wheel of ordinary dimensions on a smooth level surface. This point of contact will be found to be longitudinally about 25 mm and every piece of stone put into a road which exceeds 25 mm in any of its dimensions is mischievous. This statement is according to Macadam.
The distance, measured along the centre line of a road, over which a driver can see the opposite object on the road surface, is called
A camber of 1 in 30 means that for a 30 m wide road, the crown of the road will be
The longest distance at which a driver, whose line of sight is 1.2 m above the road surface, can see the top of an object 10 cm high on the surface of road, is called
A road within a city or town in called an urban road.