Q. |
At the end of the reconnaissance phase, the selected alignment is pegged by using about 2m high poles on which the |
A. | number of peg is marked |
B. | direction of proposed alignment is marked |
C. | distance between the two pegs is marked |
D. | all of these |
Answer» D. all of these |