At the end of the reconnaissance phase, the selected alignment is pegged by using about 2m high poles on which the |
| A. | number of peg is marked |
| B. | direction of proposed alignment is marked |
| C. | distance between the two pegs is marked |
| D. | all of these |
| Answer» D. all of these | |