

McqMate
Q. |
A diversion head work is constructed to |
A. | raise water level at the head of the canal |
B. | regulate the intake of water into the canal |
C. | reduce fluctuations in the supply level of the river |
D. | all of the above |
Answer» D. all of the above |
View all MCQs in
Irrigation EngineeringNo comments yet