McqMate
| Q. |
A diversion head work is constructed to |
| A. | raise water level at the head of the canal |
| B. | regulate the intake of water into the canal |
| C. | reduce fluctuations in the supply level of the river |
| D. | all of the above |
| Answer» D. all of the above | |
View all MCQs in
Irrigation EngineeringNo comments yet