Q.

A diversion head work is constructed to

A. raise water level at the head of the canal
B. regulate the intake of water into the canal
C. reduce fluctuations in the supply level of the river
D. all of the above
Answer» D. all of the above
2k
0
Do you find this helpful?
1

View all MCQs in

Irrigation Engineering

Discussion

No comments yet