The term balancing depth has the same me...
Q.
The term balancing depth has the same meaning as the depth of water in canal.
A.
Right
B.
Wrong
Answer» B. Wrong
685
0
Do you find this helpful?
5
View all MCQs in
Irrigation Engineering
Discussion
No comments yet
Login to comment
Related MCQs
The drainage water intercepting the canal can be disposed of by passing the canal below the drainage in
When the upstream face of a gravity dam is vertical, then the intensity of water pressure at the water surface and at the base respectively will be (where w is unit weight of water and H is the depth of water.)
The maximum average depth due to one day storm over an area of 100 km2 is 100 mm. Depth-Area-Duration (DAD) curves indicate that for the same area of 100 km2 the maximum average depth for a 3 hour storm will be
For a canal which irrigate the area directly, the fall should be provided at a location where the F.S.L. outstrips the gound level, but before the bed of the canal comes into filling.
A canal aligned roughly at right angles to the contours of the country is called ridge canal.
When the levels are such that the F.S.L. of the canal is much above the bed level of the drainage trough, so that the canal runs under syphonic action under the trough, the structure provided is known as
A solid construction put across the river to raise its water level and divert the water into the canal, is known as
The stage of river carrying a discharge of Q m7sec at a point is 10 m and slope of water surface is (1/4000). The discharge of a flood at the same point and same stage of 10 m with a water surface slope of(l/1000)willbe
When the irrigation canal and the drain are at the same level, then the cross drainage work is achieved by providing a
Which of the following canal structures is used to remove surplus water from an irrigation channel into a natural drain ?